Case Study

Project :Dumers Lane, Radcliffe

  Client :Regional Land Developer

 Scope :Strategy Advice, Remediation, Invasive Weeds

ADM Regeneration-Remediation Model Of Site In Bury For Housing And Commercial Development

The Project

 

Demolition, site clearance, relocation of knotweed and remediation of former Pfzier factory. Due to the site being within a flood plain the main development area (24 acres) required raising between 2-4m to facilitate the construction of 250 new homes and 80,000ft² of commercial premises together with the lowering of the boundary adjacent to the river to create 1km of watermeadow (3 acres).

The Problem

 

Investigation of the site identified extensive areas of made ground and structures together with significant infestation by Japanese knotweed. The original appraisal of the site identified significant import of soils to achieve suggested development levels, extensive cart away of Japanese Knotweed and a piled foundation solution to the entire development.

ADM Regeneration-Remediation Of Factory And Fly Tipped Waste

Dumers Lane - Pre-commencement

ADM Regeneration-Remediation Model of Dumers Lane Bury Topographical Survey

Dumers Lane 3D Survey Model

The Solution

 

• Upfront technical advice regarding the remediation and phasing of the site and in particular value engineering of the works to achieve

  a betterment on foundation solutions.

• Modelling of earthworks, cut and fill.

• Demolition of remaining buildings

• Tree and waste clearance

• Excavation, relocation and treatment of 20,000m³ of knotweed impacted soils.

• Removal of asbestos impacted soils.

• Grubbing up and crushing of 40,000m³ of slabs, foundations and relic structures.

• Selective excavation and placement of 150,000m³ of site won soils to achieve a vibro stone column foundation solution for all 250 new

  homes.

• Cement stabilisation of 10,000m³ of geotechnically unsuitable soils.

• Importation of 100,000m³ of soils.

• Engineering of soils beneath commercial development and roads to achieve a 5% CBR.

• Flood alleviation, implementation and creation of water meadow.

 

 

ADM Regeneration-Remediation Site Bury Greater Manchester Excavation And Engineering

Remediation Works Progressing

Conclusion

 

Works achieved on time, on budget and by careful redesign of the Remediation Strategy we saved over £1million on construction abnormals and by careful management of soils ensured that no excess soils were required to be removed from site and all subsoil capping was generated on site.

ADM Regeneration-Remediation Commercial Development Client Handover

Commercial Area After Handover To Client

ADM Regeneration-Remediation Housing Development Client Handover For Piling

Residential Area After Handover To Client

ADM Regeneration-Remediation Flood Plane Engineering Completed

Flood Plane Near Completion

Further Information

 

Please use the links below to download this case study, our brochure and 3D PDF files  (requires Adobe Reader) of the project showing the original levels and the final design.

 

Download Case Study File

Download ADM Regeneration Brochure

Download Dumers Lane 3D PDF Topographical Survey

Download Dumers Lane 3D PDF Design Model

Download Dumers 3D PDF Overlaid

Download 3D PDF Instructions

 

 

 

 

ADM Regeneration Ltd

Theatre Buildings

Carrington Business Park

Manchester Road, Carrington

M31 4DN

t : 01925 756033

f : 01925 754587

e : info@admregen.co.uk

Commercial

Public

Industrial

Residential

ADM Regeneration - Industry Standard Accreditations, SMAS, CHAS, SafeMark, SafeContractor
ADM Regeneration - Find Us On LinkedIn And See What Remediation And Demolition Clients Are Saying About Us
ADM Regeneration - Find Us On Facebook

See More Online